Nautilus

Location

Pendeen Crescent, Milton Keynes

Client

Readie Construction

Value

£700k+

Duration

14 weeks, extended

Quantity

  • 13,700 m3 topsoil strip
  • 52,700 m3 cut & fill
  • 5000 m3 earth stockpile
  • 8000 m3 type 1 Subbase
  • 3000 m3 single size free draining aggregate

Overview

Barton were contracted by Readie Construction to provide an earthworks package at project Nautilus in Milton Keynes.

The 14 week contract included enabling works and earthworks; topsoil strip, cut & fill, earthwall installation and PVD drain installation.

Initial contracted works was extended to include attenuation tank excavation and import of type 1 material.

Scope of work:

  • Site strip and stockpile
  • Cut and fill
  • PVD band drains
  • Earthwall formation
  • Granular placement
  • Attenuation tank excavation
  • Resoiling to landscape areas
  • Surplus soil disposal