Barton were contracted by Geoffrey Osborne Ltd to complete a earthworks and stabilisation package for improvements at White Hart Junction (A419/A420 interchange), for Swindon Borough Council.

Following contracted topsoil strip back and stockpile for later use, we

Completed 1,200m2 of stabilisation using a blend of RoadCem and Cement, with min 150mm imported Type 1 to create the required wearing course.

Barton have partnered with PowerCem Technologies to become the preferred UK installer of RoadCem™.

RoadCem™ is a stabilisation additive which has been specially developed for application in road building and hydraulic engineering, utilising a fine blend of powdered zeolites that enables binding with almost any kind of materials.